ESG Projects
Solar Energy
Details
A solar panel system was installed at our Head Office in September 2020 by Egni Co-op installers, Urban Solar Ltd. In the first 12 months of operation, the system generated more than 48 MWh of clean, renewable energy, reducing the carbon footprint of our building by 10.5 tonnes of CO2, the equivalent of planting 480 trees.